Boone County’s new fire station 8 offers major upgrades

VIDEO: Construction on the new Boone County Fire Protection District Station 8 is complete. Work on Station 8, located on Route K in southern Boone County, began late last year. It is expected to be fully operating by Nov. 1, according to Boone County Fire Protection District Assistant Chief Gale Blomenkamp.

The new 13,000 square foot station replaces the current station, built in 1981, and sits directly next to the existing building. It offers several major upgrades to better serve both firefighters and the community. The new building has a built-in training tower, a training room, workout space, a larger kitchen and six resident rooms.

Station 8 offers a total of four bays that are bigger compared to three bays at the current station. “All of the bays at 60 feet wide or 60 feet deep, so they’ll all drive through bays, so when they come back from a call or when they go to a call, they’ll go out the front of the station, take a right or left on the truck but when they come back, they’ll drive all the way around,” Blomenkamp said. “They can actually just drive through here so we don’t have to back in and out of the station which makes it just safe and less room for error.”

Firefighter and EMT Ryan Renoe has been a firefighter with the fire protection district for over a year. He says the bigger bays are a great addition. “We have to pull through the bays now that’s amazing,” Renoe said. “It’s pretty crammed in there right now, we know we’re all trained to know how to drive the trucks but it’ll be nice to not have to back them in just to go around and not have to worry about that,”

The training tower, is the first to be onsite at a Boone County fire station, Blomenkamp said. It is two-stories and allows firefighters to practice hose movements, standpipes and scape windows. “We have a manhole so we can do tripod work, bringing people up through a manhole, simulate somebody going through a floor and trying to rescue them with a fire hose,” Blomenkamp said. “We can simulate it with smoke and we can actually use that for training.”

KMIZ-TV ABC 17 Columbia

Share the Post:
FREE QUICK SUBSCRIBE

Sign up to subscribe to custom state
Daily Dispatch emails for free

Select list(s):